District 29
HAMILTON COUNTY SR-319 Repair of the bridge over the Tennessee River and Riverpark Drive (LM 2.2): The contractor will be performing repair operations to the bridge that will require lane closures in both directions. Extra caution should be observed of trucks entering and exiting the work-zone. During this report period the inside shoulder and inside lane of each direction are closed. Traffic is shifted to the right in both directions. Additional flaggers will be present as needed.
[Mid-State Construction Company, Inc./Osbonlighter/CNU205]
HAMILTON COUNTY The tunnel cleaning of the McCallie Tunnel on US-11(US-64, SR-2), the Stringers Ridge Tunnel on US-127(SR-8), and the Bachman Tubes on US-41 (US-76, S.R.8): On Wednesday, 09/16/20 (8 PM – 6 AM), there will be a tunnel cleaning operation at the McCallie Tunnels. This will be supported by a flagging operation. Later that night, the Stringers Ridge Tunnel will be cleaned & supported by a signed detour.
[Diamond Specialized, Inc./Micka/CNU182]
HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Lane shifts are in place on I-24 EB and WB under the Belvoir Avenue Bridge, at North and South Terrace approaching the Belvoir Avenue Bridge, and on Germantown Road under the I-24 Bridge. Alternating single and double lane closures will be required on I-24 EB and WB on 09/10/20 and between 09/13/20 through 09/16/20 from 9 PM and 6 AM. Additionally, there will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections with North and South Terrace. These closures will occur on 09/10/20 and 09/11/20, and between 09/14/20 through 09/16/20 from 9 AM to 6 AM the following morning. Motorists should be aware of the Belvoir Avenue Bridge closure and detour that was put into place on 04/20/20, and the new traffic pattern at Exit 183 on the ramp leading to the intersection of South Terrace and Germantown Road on 08/10/20. There is a 45 MPH speed limit reduction throughout the project corridor on I-24.
[Bell and Associates Construction, LP/Blevins/CMGC03]
HAMILTON COUNTY I-24 Resurfacing from the Georgia State line to near the ramp to SR-2 (US-41, US-64, US-11, Cummings Hwy): There will continue to be a paving operation on I-24 EB/WB involving lane closures as follows: Sunday – Thursday (8PM – 6AM). This project is continuous from MM 171 at the Georgia line through MM 178, just west of the US-27 split. Expect significant queueing of traffic. Manned attenuator trucks, variable speed limit signs, and two officers will be assisting in this operation.
[Talley Construction Company, Inc./Micka/CNT374]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Watch for trucks entering and exiting project. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. I-75 NB to I-24 WB split has been moved back 1500 feet from its previous location. Welcome Center traffic intending to use I-24 WB now, will have to detour on I-75 NB to Exit 3. Detailed detour information will be available at the Welcome Center. The speed limit has been reduced to 45 MPH throughout the interchange. RESTRICTIONS: There is a 14′ width restriction on the NB I-75 to WB I-24 interchange ramp. This affects wide loads at approximately MM 1.7.
[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]
HAMILTON COUNTY US-27 (I-124) Widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring in the median and shoulders of US-27. Motorists should be alert for construction vehicles entering and exiting the activity area. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. Currently EXIT 1C from northbound US-27 to 4th St. has been closed and is scheduled to reopen on 09/15/20. Motorist should use alternate posted detours at EXITS 1A and 1B from US-27 northbound, to 4th Street. On Thursday, 09/10/20, thru Wednesday, 09/16/20 between the hours of 9 AM to 9PM temporary lane closures will be in place for southbound US-27 from the Olgiati Bridge to I-24 for milling and leveling of the asphalt. A State Trooper is requested for the duration of these scheduled lane closures. On Thursday, 9/10 (9AM – 1PM) the US27 SB loop ramp servicing MLK will be closed to support a drilling operation for an overhead sign. Traffic will be signed & detoured to 6th St. RESTRICTIONS: I-124 (US-27)Southbound Exit 1C 4th St Of Ramp: No oversize/over dimensional loads; I-124 (US-27) Southbound Exit 1-B Martin Luther King Blvd. Off Ramp: No oversized/over dimensional loads; Martin Luther King Blvd. between Chestnut St. and Gateway Ave.: No oversized/over dimensional loads.
[Dement Construction Company, LLC/Micka/CNP230]
HAMILTON COUNTY TDOT Bridge Inspection on I-24 both directions from MM 178 to MM 181.5: From 7 AM to 5 PM on 09/10/20 and from 7 AM to 5 PM on 09/14/20 through 9/16/20, structure inspections will take place closing the shoulders with a mobile attenuator operation.
HAMILTON COUNTY TDOT Contractor on I-24 in both directions from MM 184.0 to MM 171.0: On Thursday, 9/10/20 (9AM – 6AM), the contractor will be installing Emergency Mile Marker signs along the median of I-24 WB. Work start at about MM 184.0 and proceed WB. On Sunday, 9/13 thru Wed ,9/16, the contractor will proceed with the sign installation. Once he gets inside the I-24 OGFC project (MM 178 to MM171), the contractor will coordinate with Talley Construction related to the direction of the installation (EB or WB).
HAMILTON COUNTY TDOT Contractor on SR-317 (BONNY OAKS DR.) westbound from LM 1.734 to LM 4.545: On Thursday and Wednesday of this reporting period, there will be intermitting lane closures on Bonny Oaks from 9 AM-3:30 PM. There will be flaggers directing traffic at several spots in this area.
HAMILTON COUNTY Utility Work on SR-2 (BROAD ST.) northbound from LM 6.13 to LM 3.12: Shoulder and single lane closure between W. 35th Street and W. 33rd Street. Arrow boards, signage and cones will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 6 PM from 09/10/20 through 09/23/20.
HAMILTON COUNTY Utility Work on SR-2 (BROAD ST.) southbound at LM 6.98: Shoulder and single lane closure between W. 24th Street and W. 27th Street. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM through 09/18/20.
HAMILTON COUNTY Utility Work on SR-319 (HIXSON PK.) northbound at LM 14.73: Shoulder and single lane closure between Heron Cove Lane and Freedom Bay Drive. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM through 09/25/20.
HAMILTON COUNTY Utility Work on SR-319 (HIXSON PK.) northbound at LM 7.98: Shoulder and single lane closure between Brookaire Road and Destiny Drive. Signage, cones, and flaggers will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM through 09/25/20.
HAMILTON COUNTY Utility Work on SR-320 (E. BRAINERD RD.) westbound from LM 3.29 to LM 5.77: Lane closure between Bel-Air Road and Greens Road with flaggers, signage, barrels and/or cones. Motorists should use caution and be aware of personnel and equipment when traveling through the work zones. This is a nighttime lane closure between 7 PM to 5 AM starting 09/14/20 through 09/18/20.
HAMILTON COUNTY SR-29 (US-27) Repair of the bridge over Big Soddy Creek (LM 20.6): During this report period the contractor will have traffic restricted with one lane of SR-29 southbound closed over Big Soddy Creek. Additionally, one lane of SR-111 southbound will be closed as it approaches the SR-29 junction.
[Mid-State Construction Company, Inc./Osbonlighter/CNU046]
HAMILTON COUNTY SR-2 (US-64, US-11) Improvement of the intersection at Edgmon Road in Collegedale (LM 22.7), including grading, drainage and paving: During this report period, the contractor will be performing grading, drainage and paving. Extra care should be taken while trucks and heavy equipment are entering and exiting the roadway. The roadway may be temporarily restricted to a one lane roadway by flagging operation.
[Talley Construction Company, Inc./Osbonlighter/CNU012]
HAMILTON COUNTY SR-317 (Apison Pike) Improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 09/10/20, 09/11/20, 09/14/20, 09/15/20, and 09/16/20 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. There will also be very short lane closures for blasting that will last five minutes or less. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]